Thought I would start a thread on what your planned or in process doing in upgrades on your Ally for the next year's boating season. I'll start :
On the Grandsport
1. mechanical trim indicator mounted on side like Bob did on his
2. adding a pyrometer gauge
3. swapping trim gauge for hour meter
4. adding black bezels to: all gauges, jack switch, key switch and kill switch
5. changing toggle switches for gps recall and trim timer to custom made black 2 rocker switch panel
6. powder coating lower unit w/ stainless powder coating (@ powder coater now)
7. new windshield (installed)
8. polish out hull (just finished)
10. completely rewire everything under dash
11. run boat with new 15X 34 labbed Mercury Cleaver
All parts are in but 3 bezels and I'll be ready for installation of everything not presently done yet. Hopefully everything should be done in 2-3 weeks and I'll be testing in December. I'll post pic's after completion and results with cleaver after testing. I'm like a kid on Christmas morning!! lol
On the Grandsport
1. mechanical trim indicator mounted on side like Bob did on his
2. adding a pyrometer gauge
3. swapping trim gauge for hour meter
4. adding black bezels to: all gauges, jack switch, key switch and kill switch
5. changing toggle switches for gps recall and trim timer to custom made black 2 rocker switch panel
6. powder coating lower unit w/ stainless powder coating (@ powder coater now)
7. new windshield (installed)
8. polish out hull (just finished)
10. completely rewire everything under dash
11. run boat with new 15X 34 labbed Mercury Cleaver
All parts are in but 3 bezels and I'll be ready for installation of everything not presently done yet. Hopefully everything should be done in 2-3 weeks and I'll be testing in December. I'll post pic's after completion and results with cleaver after testing. I'm like a kid on Christmas morning!! lol