Waterdigger
Active Member
Remove the two tab bolts at 12 and 6 oclock.Drill a 3/32 hole with half the bit cutting in carrier and the other half cutting into housing, drill about 3/8" deep. Cut two pieces of 3/32
solid brass rods 3/8" long and place in drilled holes. Replace tab bolts and go play. This works the same way a Yamaha gear case is setup with a square keyway in the bottom of carrier and housing.
solid brass rods 3/8" long and place in drilled holes. Replace tab bolts and go play. This works the same way a Yamaha gear case is setup with a square keyway in the bottom of carrier and housing.
Last edited: